Software Management Operations   
▀  Upgrading the Operating System Software 
 
▄  Cisco ASR 5000 Series System Administration Guide 
OL-22969-02   
line software upgrade can be terminated is to issue the 
 command. This causes a system restart that could leave 
the system in an abnormal state, requiring manual intervention. Issuing the reload command should be avoided, and 
only used as a last resort. 
Once all the calls on the system are terminated, the software upgrade enters Stage 2. 
 
Stage 2 - Stand-alone Operation 
In stage 2, the system switches from normal call operations, leaving only a minimal set of system-level tasks running on 
the PACs/PSCs to ensure that any errors are detected and, for PDSN and GGSN, that the re-directors used by the 
defined overload policy for each service remain in effect. 
 
At this point, the SPCs/SMCs are fully operational, but each PAC/PSC in the system is running independently of the 
others, with no communications occurring between them. In this stage, the network processor units (NPUs) are placed 
into global bypass mode, wherein the redirector tasks are supported to deny any new session requests to access the 
system by redirecting them to other devices. 
While in global bypass mode, Line Card (LC) ports will be limited to the following services: 
 
Respond to Ethernet ARP requests 
 
Respond to ICMP echo requests 
 
Session rejections or redirection 
The following list defines LC features or services that will be unavailable: 
 
No AAA packets or logs will be sent for each session reject or redirect 
 
All other packets are discarded 
 
LC port counters will be unavailable 
 
Port redundancy operations, if configured, will not be operational 
 
All routing protocols, if enabled and configured, will be disabled 
 
Routing tables will remain fixed (no updates) throughout the upgrade 
 
PCF monitoring will be unavailable 
Important:
  Once Stage 2 has begun, no CLI configuration mode commands, except 
 and 
 (if this stage is entered while a management user is in a configuration mode) will be accepted 
by the system. Only non-configuration commands within the Exec mode, such as show commands 
may be executed. You can monitor the progress of the on-line software upgrade by entering the 
 command. 
Once all of the PACs/PSCs are operating in stand-alone mode, the on-line software upgrade can proceed. 
 
Stage 3 - Management Card Upgrade 
During this stage, the system performs an SPC/SMC switchover, wherein all tasks running on the active SPC/SMC are 
transferred to the standby SPC/SMC, which then becomes active and takes control of the system.