Cisco Cisco MGX-FRSM-HS2 B Serial Frame Service Module Libro blanco

Descargar
Página de 25
 
 
White Paper 
© 2009 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information. 
Page 7 of 25 
Figure 3.    WAAS Deployment Life Cycle 
 
1.  Identify applications: Identify the customer business-critical applications 
2.  Determine acceptable performance: Assess and/or baseline to determine the acceptable performance  
3.  Find problematic sites and applications: Find sites, applications and time periods with unsatisfactory 
performance 
4.  Short-list candidate sites and applications: Short-list the ones WAAS is believed to have most impact on 
5.  Install WAAS: Install WAAS and configure the solution to enable performance analysis 
6.  Analyze impact: Perform WAAS solution impact analysis 
7.  Monitor & Troubleshoot: Keep on-going track of network performance and address performance issues 
The following sections provide more information about each of the above steps. 
3.1  Identify Applications 
What are we trying to achieve?  
In this step we are trying to find the applications that the customer should track for his business critical transactions. 
The applications we find can be used in the following steps for analysis and potential optimization. 
How do we achieve that? 
Typically, customers determine which applications are critical to their business. If the list of the important 
applications and servers is already known the user can skip this step.