Chapter 9      Scheduling Processes
  Scheduling a Process to Run Only Under Certain Conditions
Scheduling a Process to Run Only Under Certain Conditions
Using the Conditions tab in the Properties dialog, you can schedule a process to run based on an equation 
evaluated at run time. The process will be run only if the specified conditions are met.
To schedule an existing process to run only under certain conditions:
Step 1
In the Process Editor, choose Toolbox > Processes, highlight the name of the process you want to 
schedule, then choose Process > Edit.
Step 2
In the Process Properties pane, click the Triggers tab, then choose New > Schedule from the drop-down 
list.
Step 3
Click the Conditions tab. 
  •
Use the Basic panel to create a simple variable condition using a variable to match to operator 
criteria. For example, you can insert a variable reference based on a schedule value such as the 
schedule name or the local time. Or click Show advanced properties to see addition variable 
references.
  •
Use the Advanced panel to create a more complex condition. You can define the properties of the 
conditions within the Advanced panel, as well as within the Properties dialog box.
For more information about using conditions, see 
Step 4
Define any additional required properties, then click OK.
Note
For information about the property fields, see the online help.
Step 5
Click Save 
 to save your changes.
Using a Calendar in a Condition
Calendars are “time” conditions that evaluate to true on the days in the specified calendar and between 
the specified start and end time. For more information about conditions, see 
.
To use a calendar in a condition:
Step 1
In the Process Editor, you can:
  •
Add a condition to a process by choosing Toolbox > Logic, then drag a Condition or a Condition 
Branch 
into the workflow panel.
  •
Edit an existing process by choosing Toolbox > Processes, highlight the name of the process, then 
choose Process > Edit.
Step 2
In the Properties panel, click Advanced > New > Time Condition.
Step 3
Choose one of the calendars from the dropdown list and adjust the start and end times as needed.