Cisco Dual Tier Addressable Stretch Tap Guía De Instalación
Installation Procedure
590212 Rev G
41
8 Using a small cable tie, secure the twisted-pair sheath to the bottom of the
Twisted Pair module. Refer to the illustration in step 6 for the tie wrap location.
CAUTION:
Be sure to use a high-quality cable tie that is flame-resistant as well as
resistant to ultraviolet light, chemicals, and temperature extremes.
Be sure to use a high-quality cable tie that is flame-resistant as well as
resistant to ultraviolet light, chemicals, and temperature extremes.
Note: The width of the cable tie must be 0.150 in. (3.8 mm) or less. Suggested
cable tie materials, in descending order of preference, are:
cable tie materials, in descending order of preference, are:
Stainless steel
Halar (flourocarbon - ECTFE)
Tefzel (flourocarbon - ETFE)
High density polyethylene
Weather resistant polypropylene
9 Using insulated pliers, plug a PTC assembly into the PTC guide socket
corresponding to the drop port on which you want to enable power. For
example, placing a PTC assembly in location 1 activates drop port 1. Refer to the
drawing below.
example, placing a PTC assembly in location 1 activates drop port 1. Refer to the
drawing below.
WARNING:
Avoid electrical shock or damage to this product. Use insulated pliers to
install or remove PTC assemblies.
Avoid electrical shock or damage to this product. Use insulated pliers to
install or remove PTC assemblies.