Cisco Cisco Workload Automation 6.3 Guía Del Usuario

Descargar
Página de 42
33
Using the BusinessObjects BI Platform Adapter
Monitoring Job Activity
3.
On the CWA toolbar, click the 
Add
 button to display the 
Action Definition
 dialog.
4.
In the 
Action Name 
field, enter the name of the new BOBIP action.
5.
Select the owner of the action from the 
Owner
 list.
6.
From the 
BusinessObjects BI Platform Connect 
list, select the CMS server where you want to trigger an event.
Note: 
For the BOBIP custom event trigger to work reliably from a CWA action, the clocks on the CMS server machine 
and the CWA master machine must be synchronized (using a time service or other synchronization mechanism).
7.
From the 
Custom Event
 list, select the event that you want to trigger with this action.
The 
Description
 field is a read-only field that displays the description corresponding to the selected custom event.
Monitoring Job Activity
As BOBIP tasks run as pre-scheduled or event-based jobs, you can monitor the jobs as you would any other type of job 
in CWA using the 
Job Details
 dialog. You can also use Business Views to monitor job activity and view when the jobs 
are active (see the Cisco Workload Automation User Guide for instructions).
To monitor job activity:
1.
In the 
Navigator
 pane, select 
Operations>Job Activity 
to display the 
Job Activity 
pane.
2.
Right-click to select a job
 
and choose 
Details
 from the context menu.
The 
Job Details
 dialog displays. The 
Status
 page displays by default. You can view the status of the job, the start 
and end time, how long it ran, and how it was scheduled. The external ID is the BOBIP job number.