Cisco Cisco StadiumVision Mobile Guía De Instalación

Descargar
Página de 71
© 2011 Cisco Systems, Inc. All rights reserved   
Page 13 of 71 
 
There are many solutions to address cable management. They can range from 
simple cable management rings, to cable management brackets, to vertical or 
horizontal organizers, to troughs and ladders. 
All SV Director Server cables should be properly dressed so as not to interfere 
with each other or other pieces of equipment. Use local practices to ensure that 
the cables attached to your appliance are properly dressed. 
Method of Procedure 
As described previously, part of your preparation includes reviewing installation 
plans or MOPs. An example of a MOP (a pre-installation checklist of tasks and 
considerations that need to be addressed and agreed upon before proceeding 
with the installation) is as follows: 
1.  Assign personnel. 
2.  Determine protection requirements for personnel, equipment, and tools. 
3.  Evaluate potential hazards that may affect service. 
4.  Schedule time for installation. 
5.  Determine any space requirements. 
6.  Determine any power requirements. 
7.  Identify any required procedures or tests. 
8.  On an equipment plan, make a preliminary decision that locates each SV 
Director Server that you plan to install. 
9.  Read this hardware installation guide. 
10. Verify the list of replaceable parts for installation (screws, bolts, washers, and 
so on) so that the parts are identified. 
11. Check the required tools list to make sure the necessary tools and test 
equipment are available. See Required Tools and Equipment.  
12. Perform the installation. 
Unpacking and Checking the Contents of Your Shipment 
The shipping package for the SV Director Server is designed to reduce the 
possibility of product damage associated with routine material handling 
experienced during shipment. To reduce the potential damage to the product, 
transport the unit in its original Cisco packaging. Failure to do so may result in 
damage to the unit. Also, do not remove the unit from its shipping container until 
you are ready to install it. 
The server, cables, and any optional equipment you ordered may be shipped in 
more than one container. When you unpack the containers, check the packing 
list to ensure that you received all the parts listed in Table 10
A ―Notes‖ section 
has been provided to record damaged or missing items.