Cisco Cisco RF Gateway 10 Guía De Instalación
• Close the ejector levers and tighten the captive screws.
Step 5
Verify that the SFP modules are properly seated in the ports on the faceplate:
• Verify that no cables are broken at the connector.
• Verify that the transmission (Tx) and reception (Rx) are properly oriented and inserted in any optical
SFPs.
• Verify that the correct level of software licensing is available for the card.
Verifying the Status of the Line Card
Procedure
Step 1
Ensure that the STATUS LED illuminates green (module operational).
Step 2
When the Cisco RFGW-10 DS-384 is online, use the show module command to verify that the system
acknowledges the new module and that the status of the module status is good.
acknowledges the new module and that the status of the module status is good.
Step 3
If the module is not operational, re-seat it. If the module is still not operational, contact your customer service
representative.
representative.
Verifying the Status of the Supervisor Card
For installation instruction for the Supervisor card, see
.
Procedure
Step 1
Ensure that the STATUS LED illuminates green (module operational).
Step 2
When the Supervisor card is online, enter the show module all command. Verify that the system acknowledges
the new module and that the status of the module is good.
the new module and that the status of the module is good.
Step 3
If the module is not operational, reseat it. If the module is still not operational, contact your customer service
representative.
representative.
Cisco RF Gateway 10 DS-384 Line Card Hardware Installation Guide
OL-26265-04
13
Cisco RF Gateway 10 DS-384 Line Card Hardware Installation Guide
Verifying the Status of the Line Card