Plug In and Power Up the
Appliance
Plug in the appliance, then power up the appliance by pressing
the On/Off switch on the front panel of the Cisco M690. You
must wait 10 minutes for the system to initialize each time you
power up the system.
the On/Off switch on the front panel of the Cisco M690. You
must wait 10 minutes for the system to initialize each time you
power up the system.
After the machine powers up, solid green lights on the front of
the appliance indicate that the appliance is operational. The
network activity light will be green but may not be solid.
the appliance indicate that the appliance is operational. The
network activity light will be green but may not be solid.
Caution
If turned on quickly after connecting power to the
appliance, the appliance powers up, the fans spin
and the LEDs turn on. Within 30-60 seconds, the
fans stop and all LEDs turn off. The appliance
powers on 31 seconds later. This behavior is by
design to allow the system firmware and controller
to synchronize.
appliance, the appliance powers up, the fans spin
and the LEDs turn on. Within 30-60 seconds, the
fans stop and all LEDs turn off. The appliance
powers on 31 seconds later. This behavior is by
design to allow the system firmware and controller
to synchronize.
Wait at least 10 minutes for the system to complete
the power up sequence and the LEDs to turn green.
If you turn the power off before the initialization is
complete, the appliance will NOT reach an
operational state and must be returned to Cisco.
complete, the appliance will NOT reach an
operational state and must be returned to Cisco.
7
Data 5
A Gigabit Ethernet customer data
interface.
interface.
8
Management
interface
interface
The Gigabit Ethernet interface that is
restricted to management use only.
restricted to management use only.
Item
Port
Description