Acer aspire 4920 4920g (tahoe) Manuales De Servicio

Descargar
Página de 150
Chapter 3
89
14. Remove the screw (G) that holds the board to the panel. 
15. Turn the inverter board over.  
16. Disconnect the 2P cable from the inverter board, then disconnect the inverter board cable from its 
connector.
17. Remove the inverter board.
Removing the LCD with Brackets
1.
2.
3.
4.
5.
6.
7.
8.
9.
Step
Size (Quantity)
Color
Torque
1~2
M2.5 x L6 (2)
Black
3 kgf-cm
SG_Aspire4920_Book.book  Page 89  Monday, May 28, 2007  6:49 PM