Gateway 7250R Manual De Usuario

Descargar
Página de 135
12
          System Setup
Starting the server
Before you start the server for the first time, make sure:
If the power supply is autosensing, it will not have a voltagte selection 
switch and it automatically determines the voltage of the incoming 
power source.
All cables are firmly connected to the proper ports on the back panel of 
the server.
The server and monitor are plugged into an AC outlet, power strip, or 
UPS and that the power strip or UPS is turned on.
 To start the system:
1
If you have connected the system components to a power strip or UPS, 
make sure all the system components are turned off, then turn on the 
power strip or UPS.
2
Turn on the monitor.
3
Turn on the server. The light-emitting diode (LED) on the control panel 
is on when the power is on.
4
Turn on any other components connected to the server, such as speakers, 
a printer, or a scanner.
If nothing happens when you turn on the system:
Make sure that the power cables are securely plugged in and that 
the power strip or UPS (if you are using one) is plugged in and 
turned on.
Make sure the monitor is connected to the server, plugged into the 
power strip, AC outlet, or UPS, and turned on. You may also need 
to adjust the brightness and contrast controls on the monitor.
Caution
Electricity can flow from connected peripherals into the 
system causing a shock. Make sure the server and 
peripherals are turned off and unplugged from the power 
outlet when you connect peripherals to the server.
8506162.book  Page 12  Wednesday, May 10, 2000  10:21 AM