Toshiba satellite p200 p205 Manuales De Servicio

Descargar
Página de 193
3.  Tests and Diagnostics 
3.13 Magnetic Switch Test 
3.12 Magnetic Switch Test 
The lid switch test checks the lid function of the unit. When LCD cover closed, the lid should 
enable to turn off the display. 
NOTE:  Remember to tune up the volume as “Maximum” before this test starts. 
 
Follow below steps to run this test:  
1.  Close the LCD cover. 
2.  Heard 3 “Beep” sound happened during LCD closed. 
3.  Open the LCD. 
Then it will indicate whether the test is passed or failed. 
 
 
 
 
 
 
Satellite P200/P205 /Satellite Pro P200 Series Maintenance Manual