SMC Networks robo cylinder ra7ad Manual De Usuario

Descargar
Página de 79
 
33 
 
 
14. Maintenance 
 
 
14.1 Maintenance Schedule 
 
Perform maintenance work according to the schedule below. 
 
The schedule is set assuming eight hours of operation a day. When the operation time is long such as 
24-hour operation, shorten the maintenance intervals as needed. 
 
 Visual 
inspection 
Grease 
supply 
 
Start of operation 
 
 
After 1 month of operation 
 
 
After 3 months of operation 
{ (Sliding surface of the rod)  *1 
Every 3 months thereafter 
{ (Sliding surface of the rod)  *1 
After 3 years of operation, or upon 
reaching 5,000 km in traveled distance
 
 
 
Every year thereafter 
 
 
*1  Apply grease to the sliding surface of the rod at the startup check if grease has been consumed, or 
every three months. 
For the RCS2W dustproof/splash-proof type, apply grease when the bellows is changed. 
 
14.2  Visual Inspection of the Machine Exterior 
 
Check the following items visually. 
 
Body   
Loose mounting bolts?   
Cables   
Damage to cables or connection to connector box?   
General  
Unusual noise or vibrations?  
 
 
14.3 Cleaning 
 
•  Clean the exterior as needed. 
•  Wipe off dirt with a soft cloth. 
•  Do not use strong compressed air on the actuator as this may force dust into the crevices. 
•  Do not use petroleum-based solvent on plastic parts or painted surfaces. 
•  If the unit is badly soiled, apply a neutral detergent or alcohol to a soft cloth, and wipe gently.