Pfaff 489 Manual De Usuario

Descargar
Página de 60
 
 
Installation and commissioning
 
9
Installation and commissioning
The machine must only be mounted and commissioned by qualifi ed personnel! 
All relevant safety regulations are to be observed!
3
.01 
Connecting the plug-in connections and earth cables
Fig. 3 - 01
Connect all plugs as labelled to the control box .
 
Screw the earth cable from the sewing head to earth point 
 
A. 
With an earth cable connect earth point 
 
C and D to earth point A.
Screw the earth cable from the main switch 
 
1 to earth point A. 
Screw the earth cable 
 
2 from the motor to earth point B.
X4/B
SM1
X4/A
SM2
X15
Fadenwächter
X11/A
CAN-BUS
X11/B
Sollwertgeber
X1/A
RS 232
X1/B
SSI
Eingänge
X5
Ausgänge
X13
ATTENTION
Danger of exchange
ACHTUNG
Vertauschungsgefahr
A
B
C
D
1
2