GTO pro-sl 51006100 Manual De Usuario
12
4.
Chain adjuster bolts: adjust outside nut until desired chain tension is achieved. Tighten inside nut to secure
bolt (see illustration below).
bolt (see illustration below).
5.
Release foot pedal to re-engage chain sprocket.
Connecting Power to the Operator
Have a licensed electrician run 115 Vac wiring into a Field Wiring Connection Compartment (ON/OFF) box. The
115 Vac line will power the gate operator system. The circuit must be protected with a 15 A main disconnect breaker
(not provided).
115 Vac line will power the gate operator system. The circuit must be protected with a 15 A main disconnect breaker
(not provided).
NOTE: Power and wiring connections MUST be installed by a licensed electrician in accordance with NEC
(National Electric Code) and local codes.
(National Electric Code) and local codes.
NEVER run low voltage (e.g., accessory or receiver) wires in conduit containing 115 Vac wiring.
After the gate operator is connected to the 115 Vac power supply, the limit switches can be set. See ADJUSTING
THE LIMIT SWITCHES on the next page.
THE LIMIT SWITCHES on the next page.
• Fingers, hands, and
loose clothing may be
dragged into chain
sprockets.
dragged into chain
sprockets.
• Fingers and hands can
be injured by rotating
sprockets.
sprockets.
• Keep hands, fingers,
and loose clothing
away from chain and
sprockets.
away from chain and
sprockets.
WARNING
!
Sprocket
Chain
Chain
Bracket
Bracket
Chain
Bracket
Bracket
Gate
Roller Guides
Chain (included)
Master Link
(included)
(included)
Chain Bracket and Adjustment Bolt
(included)
slack (1" for every 10' of chain)