GE sg series 10 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
24/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
Rectifier Utility data screen 
This screen refers to the AC source supplying the Rectifier
This screen displays: 
• 
Iout1 = output current Rectifier Bridge
• 
Iout2 = output current 2
nd
 Rectifier Bridge (optional 12 pulse Rectifiers only). 
• 
The voltage levels between the three phases (line-to-line). 
• 
The input frequency of the Rectifier.
 
 
RECTIFIER 
 U12=481V  Iout1 =107A 
  U23=480V 
Iout2 =   0A 
 U31=482V  f=60.0Hz 
m etering
 
alarm s
 
param eters
+
ok
 
 
Inverter data screen 
This screen displays: 
• 
The voltage level of the three phase voltages (line-to-neutral). 
• 
The output frequency of the Inverter
• 
The synchronization status of the Inverter with respect to Utility
 
INVERTER: U1=277V 
U2= 277V 
U3=277V 
Frequency = 60.0Hz 
Synchronized
 
metering
 
alarms 
parameters
+
ok
 
 
Status Load screen 
This screen displays: 
• 
The Load level in kVA (for RPA: only this unit). 
• 
The Load level as a percentage of the nominal rated Load (for RPA: only this unit). 
• 
The source of the power supplied to the Load.
 
 
LOAD ON UPS 
Load = 
 
25.20kVA 
Percentage =   84% 
LOAD ON INVERTER 
metering
 
alarms 
parameters 
+
ok
 
 
Load on phases screen 1 
This screen displays for each phase: 
• 
The output phase voltage and current as RMS values (for RPA: total value of Parallel 
System). 
• 
The output Load as percent (for RPA: respect to the rated power of Parallel System).
 
 
LOAD ON PHASES 
 U1=277V  I=30A  84% 
 U2=277V  I=26A  73% 
 U3=277V  I=27A  76% 
metering 
alarms 
parameters
+
ok