GE 225 Manual De Usuario

Descargar
Página de 38
 
GE
 
OPM_SGS_ISG_M22_M30_0US_V011.doc 
16/38 Installation 
Guide 
SG Series 225 & 300 kVA 
3.6 UNPACKING 
The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden 
crates (if requested). 
 
Move the cabinets as close as possible to the final location before removing from the pallet. 
 
If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the 
heavy weight of the equipment. 
 
 
 
Take care not to damage the UPS when moving by forklift.
 
 
 
 
For parallel systems, the delivery also includes the bus control 
cables for inter-connecting the UPS modules.
 
 
 
 
Packing material recycling 
GE Industrial Systems, in compliance with environment protection, uses 
only environmentally friendly material. 
UPS packing materials must be recycled in compliance with all applicable 
regulations.