 Installation 
Guide 
SG Series 225 & 300 kVA 
3.8.3  Power connection separate input utility 
 
S
G
S
_2
2
5-
30
0
_U
P
S c
o
n
ne
ct
ion 
separ
ate_
GE_01US
PE Load
PE
Input rectifier
Position of the PE compression lugs in case
the cable input is from the bottom of the UPS
Input rectifier
PE
PE Load
L1-2
L2-2
L3-2
2
 - I
N
PU
T
 BY
PAS
S
1 -
 IN
PU
RE
CT
IF
IE
R
N
L3-1
L2-1
L1-1
L3
L2
L1
LO
AD
N
Fig. 3.8.3-1   Power connections Separate Input Utility
 
 
Separate Input Rectifier / Bypass 
L1-1 
Rectifier Phase A 
L1-2 
Bypass Phase A 
L2-1 
Rectifier Phase B 
L2-2 
Bypass Phase B 
L3-1 
Rectifier Phase C 
L3-2 
Bypass Phase C 
Neutral (Bypass) 
PE 
Ground 
 
The interconnection links BR1BR2 and BR3 must be removed (see Fig. 3.8.3-2). 
 
 
Output Load 
L1 
Load Phase A L2 
Load Phase B L3 
Load Phase C 
Neutral 
PE  Ground 
 
 
Bus bars BR1BR2 and BR3 must be removed
Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above. 
Connect wire to the Lugs using appropriate tools and appropriate torque. 
Torque specification for Input/Output and DC power connections on Bus BarsSection 3.8.1