Cissell chmw35-we55-165 Manual De Usuario

Descargar
Página de 32
8
3
B
A
D
C
E
C
D
D
C
G
B
A
E
F
The machine must be securely fixed  on a flat surface (metal base, concrete or
solid ground). The anchoring is to be done on the provided places (A) in the base.
(See Dimensions 2)
The machine must be placed entirely level. For easy maintenance it is recom-
mended to keep a minimal distance of 600 mm between the wall and the back
of the machine.
If several machines are placed next to each another, there should be a minimal
distance of 30 mm between each machine.
Installation and connection
Surface
Anchoring
The machine is delivered with hoses with 3/4" connections. These hoses fit the
water inlet valves of the machine and the main water inlet taps. To ensure the
optimal functioning of the water inlet valves, the water pressure on the inlet
should be between 0,5 and 10 kg/cm²  (7 and 145 psi). If the pressure is too low,
the cycle time will increase considerably.
In case of boiler fed machines, a minimum of hot water of 90°C should be
available: For the WE55: 50 l.     WE110: 90l.
For the WE73: 65 l.     WE132: 120l.
For the WE95: 80 l.     WE165: 140l.
Water connection
The machine must be anchored directly on a concrete base.
Directly on the ground
The machines must be fixed on a metal base which is securely anchored on a
concrete base.
A: Bolt M12 (WE55/73/95), M16 (WE110/132/165)
B: Concrete base (WE55/73: 20cm, WE95/110: 30cm, WE132/165: 40cm)
C: Washer 40x17x4
D: Nut M12 (WE55/73/95), M16 (WE110/132/165)
E: Base of the machine
F: Metal base
On a metal base
A: Bolt M12 (WE55/73/95),
 
M16 (WE110/132/165)
B: Concrete base (WE55/73: 20cm, WE95/110: 30cm, WE132/165: 40cm)
C: Washer 40x17x4
D: Nut M12 (WE55/73/95),  M16 (WE110/132/165)