Bunn ITCB-DV Manual De Usuario

Descargar
Página de 79
Page 9
1.  Insert an empty funnel into the funnel rails.
2.  Place an empty server under the funnel.
3.  Connect the brewer to the power source. Make sure 
the ON/OFF switch is ON (LED will be lit).
4.  Water will flow into the tank and stop when the tank 
is filled to its capacity. Display will show  PLEASE 
WAIT...TANK FILLING until tank is filled with water.
5.  Wait approximately twenty minutes for the water in 
the tank to heat to the proper temperature. Display 
will show  READY TO BREW...WATER TEMP: 205° 
when tank is at operating temperature. Some water 
will drip from the funnel during this time; this is due 
to expansion and should not occur thereafter.
6.  Place  a  small  vessel  beneath  the  faucet  and  open 
the faucet handle. Release it when you hear the tank 
refilling.
7.  Water volumes and flow settings have been preset 
at the factory. Refer to adjustments for the Set Brew 
Volumes section of this manual should the volume 
need to be increased or decreased.
8.  The brewer is now ready for use in accordance with the 
instructions for Tea Brewing and Coffee Brewing.
VIEWING ASSIGNED RECIPES & ASSET NUMBER
1.  Make sure the ON/OFF switch is OFF (LED will not be lit).
2.  Press and hold BREW A. The display will show the name of the recipe assigned to Brew A along with SWITCH 
NOT ON. This is to indicate that a brew cannot be initiated while the ON/OFF switch is OFF.
3.  Repeat for BREW B and BREW C.
4.  Make sure the ON/OFF switch is OFF. To view the asset number of the machine, press and hold the left hid-
den button until the display reads: ANXXXXXX...ASSET NUMBER. Release the left hidden button.
5.  After a 5 second delay, the display will read: ITCBXXXXXX. This is the serial number of the machine.
36748 101505
INITIAL SET-UP