Cisco Systems DPC3000 Manual De Usuario

Descargar
Página de 36
32 
 
4023034 Rev B 
 
Front Panel LED Status Indicator Functions 
 
Front Panel LED Status Indicator Functions 
Initial Power Up, Calibration, and Registration 
The following chart illustrates the sequence of steps and the corresponding 
appearance of the cable modem front panel LED status indicators during power-up, 
calibration, and registration on the network. Use this chart to troubleshoot the power 
up, calibration, and registration process of your cable modem. 
Note: After the cable modem completes step 8 (Registration Complete), the modem 
proceeds immediately to step 9, Normal Operations. See the table in Normal 
Operations
 (on page 33)
 
Front Panel LED Status Indicators During Initial Power-Up, Calibration, and Registration 
Step 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
Front Panel 
Indicator 
Power 
Up
 
Self 
Test
 
Downstream 
Scan
 
Downstream 
Signal Lock
 
Ranging
 
Requesting 
IP Address
 
Registering
 
Registration 
Complete 
1
 
POWER 
On On 
On 
On 
On  On 
On 
On 
2
 
DS  
Blinks On 
1 sec 
Blinks On 
On 
On 
On  On 
3
 
US 
Blinks On 
1 sec 
Off Off  Blinks 
On On On 
4
 
ONLINE 
Blinks On 
1 sec 
Off Off  Off 
Off Blinks 
On 
5
 
LINK 
Off On 
1 sec 
Off - When no devices are connected to the Ethernet or USB ports 
On - When devices are connected to the Ethernet or USB ports 
Blinks - When data activity is present 
On