Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Guia De Especificaciones

Descargar
Página de 336
C-1
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
A P P E N D I X
C
Repacking the Switch
If you need to return or move the Catalyst 6500 series switch chassis, follow these steps to repack the 
switch using the original packaging material:
Step 1
Set the chassis in the bottom pallet. (See
.)
Step 2
Place the packing bag over the chassis.
Step 3
Place the front-packing material and power supply packing material around the chassis.
Step 4
Place the power supplies in the spaces provided in the power supply packing material. (See
Step 5
Place the top-packing material over the top of the chassis and power supplies.
Step 6
Place the rack-mount kit and the accessory kit on the top-packing material.
Note
You must include the accessory kit for the final packaging to fit properly.
Step 7
Place the outside carton over the entire package.
Step 8
Fold the outside carton down over the top and seal with packing tape.
Step 9
Wrap three packing straps tightly around the top and bottom of the package to hold the outside carton 
and the bottom pallet together. (See