xG Technology Inc. XMAXBSN25 Manual De Usuario

Descargar
Página de 19
BSN250 Guide
xG Technology Inc. Proprietary and Confidential Information
installing the xmax bsn-250 
To install the six units that comprise the xMAX BSN-250 Base Station:
Mount the six components of the base station as shown in Figure 1, into a standard 19-inch (480 mm) 
rack that is at least 18 inches deep and 15U high.  
ATTENTION
Be sure to follow proper safety precautions when lifting heavy equipment.    
2.   Two 10/100 Mbps RJ-45 Ethernet connectors are installed on the rear of the control unit. The Ethernet 
ports are used to connect the base station to the backhaul network and the xMSC. Connect the Ethernet 
cable to the control unit, as shown in Figure 2.
1.
Figure 1: Base Station Components – Front/Side View
[Needed  from  xG:  New  image  to  reflect  current  design/labeling  of  the 
units.]