Gasngo R&D Ltd. RDR008 Manual De Usuario

Descargar
Página de 66
 
 
52
Chapter 3 – Station Installation Manual         
 
 
Appendix 2 - Infrastructure Requirements 
Electrical Cable 
From the 12 V power supply to the GSC: 
3 x 1.5 mm
2
 XLPE n (N2XY) limited to a length of 200 m. 
When using an extension cord within the allowed length, use an extension cord type 2 inside a 10 
x 10 cm junction box for outdoor use. 
Communications Cable 
From the gas-station’s exchange/PC to the GSC: 
CAT5e UTP cable limited to 90 meters in length. 
If a longer one is required, an extension may be used. 
Use shielded sockets and cables. 
PC and Operating System 
The Gasngo™ software is installed and runs on the same PC as the station’s FS.  
It is recommended to use a UPS. 
PC Minimum Requirements 
 
Windows XP operating system with .NET framework 2.0. 
 
Pentium 4 processor 1 GHz or more. 
 
512 MB RAM and higher.  
 
50 MB free disk space. 
The Gasngo™ software takes approximately 8 MB. 
The Gasngo™ system is designed to run on modern PCs equipped with the latest available 
updates to the operating system.