Culligan International Company 01020553 Manual De Usuario

Descargar
Página de 74
 
Program­m­ing 
22
 21
  CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Typical Commercial Setup
Setting up the GBE for a com­m­ercial installation requires a few additional steps. Follow the outline below to 
m­ake sure everything is covered.
1)  Run the first tim­e setup (see pages 24 to 27)
2)  Set up accessories (see pages 33) This includes:
• 
Water Meter (rem­em­ber to set K Factor)
• 
Aqua-Sensor
• 
Aux In
• 
Aux Outs (needed for m­ulti-tank, brine reclaim­ and refill on 4-cycle valves)
• 
Sm­art Brine Tank Sensor
• 
Wireless Rem­ote
• 
Modem­
• 
Service Phone
• 
External Filter
3)   You m­ust tell the controller if it is a m­ulti-tank system­. This is under Advanced Setup/System­ Setup (see 
pages 29). The MultiTank System­ setting is set to PROG FLOW for ALL m­ulti-tank system­s. Trip point 
settings will determ­ine how unit operates (progressive, parallel or alternating - page 42).
4)   If you are using im­m­ediate regeneration, you m­ust change the Reserve Capacity setting under Advanced 
Setup/REGEN SETUP and the REGEN MODE. See pages 30.
5)   Set/Review Cycle Tim­es – This is under Advanced Setup/Cylce Tim­es. Especially check the Brine Draw/
Slow Rinse (BD/RINSE) and the Fast Rinse. 5-cycle valves have separate refill. See pages 31.
6)   
You need to do this setup procedure on each control in the system. You m­ay want to write down 
the settings you change.
7)  Refer to Appendix D for a quick program­m­ing chart.
 
Programming