Applied Wireless Identifications Group Inc. R27CA012 Manual De Usuario

Descargar
Página de 12
MPR-2010BR
Page 9
Doc# 041318
3.6 GROUNDING
Grounding is critical for proper operation of MPR-2010BR.  When installing the reader, it
is crucial to assure that the earth ground is the best ground available.  If you elect to use
the 120 VAC power ground, conduct a test by measuring its resistance relative to a
known good ground, such as a cold water pipe or structural steel that is in direct contact
with the ground. The resistance should be less than 50 ohms.
4  INSTALLATION PROCEDURE
This section provides information on installation and operation of MPR-2010BR readers.
4.1  PARTS LIST
Verify that all items listed below are present before starting the installation.
a. 
Sentinel-Sense 
MPR-2010BR      
Qty=1
b. 
Documentation 
and 
Demo 
Program 
CD    
Qty=1
c.  Power supply   PS9-2A-SW, 50-60 Hz and 110 to 220 VA  
Qty=1
d.  LRMB   Reader mounting bracket (Optional)
4.2  PREPARATION FOR INSTALLATION
Familiarize yourself with the connectors and pin out assignment of each I/O connectors
as shown in section 2.2.1.
4.2.1  Bench Top Verification
It is always a good idea to verify system operation before committing to a full-scale
installation. The following are the necessary steps to test the reader s operation in a
static environment.
q
Connect MPR-2010BR to the RS-232 port of a PC
q
Connect the power jack from the wall plug power supply to MPR-2010BR.
q
Power up PC
q
Install demo software on PC
q
Activate demo software and verify performance of the reader.
q
Select COM port 1 on top page then click  Connect . Follow with some
commands.
q
Place the RFID tags at the exact same locations as the final configuration
q
Measure tag s read distance and confirm that read distance is correct.
4.2.2  Aiming of Antenna
Antenna Pattern for MPR-2010BR