Comba Telecom Ltd. MU-6100 Manual De Usuario
USER MANUAL FOR COMFLEX 6100 1W
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 52
Figure 66: Dev Info & Date/Time
Dev Info mainly used to record device location and Date/Time provid a time reference. Mouse click the
Config Value of Date/Time to auto receive the computer time.
NOTE: Make sure all the ANT ports of RUs are connected with dummy load or antenna system
before proceeding to step 4.
Config Value of Date/Time to auto receive the computer time.
NOTE: Make sure all the ANT ports of RUs are connected with dummy load or antenna system
before proceeding to step 4.
Step 4: Click
to enter to MU Calibratiion page after finishing Parems Setting.
Select a frequency band that need to calibrate from the table in the middle of the page.
Read Tip1 on the left side and click
Read Tip1 on the left side and click
of Tip 1
Input signal to a RF port of RFU which you want to calibrate.
Read Tip2 on the left side and enther the input power in the box (Suggested input power 10-
Read Tip2 on the left side and enther the input power in the box (Suggested input power 10-
30dBm). Input power has to be >10dBm for successful calibration.
Click
.
Tip of MU calibration finish will show up on the left of the page, and calibration results will
show in the table.
NOTE: Each RFU needs to be calibrated; click “More” at last step of process to calibrate next
RFU.
RFU.