Comba Telecom Ltd. RD-2020 Manual De Usuario

Descargar
Página de 33
INSTALLATION GUIDE FOR RD-2020 
 
 
 
RD-2020 CDMA QI 
Copyright - refer to title page 
Page 18
ENU Status : 1-0-0 
 
 
 
3.3.7 ATTACHING EQUIPMENT ONTO MOUNTING RACK 
•  Located on the rear of the equipment enclosure are protruding vertical cooling fins. 
•  The two outer fins are designed for mounting the equipment onto the mounting rack; each of these fins 
has steel threaded inserts already fitted. 
•  Partially thread the hex socket bolts onto the steel threaded inserts identified in the following drawing 
as: ‘1’ and ‘4’. 
•  Lift the equipment and position it over the mounting rack, such that the hex bolts rests in their 
designated locations on the mounting rack. 
•  Insert four more hex socket bolts ‘2’, ‘3’, ‘5’ and ‘6’ onto steel threaded insets to ensure the equipment 
is firmly mounted. 
•  Tighten all hex socket bolts to secure the equipment onto the mounting rack. 
 
M8x20 hex  bolt
3
2
1
5
4
6
 
Figure 8: Attaching the Equipment onto the Mounting Rack 
 
  
3.3.8 DRIP-LOOP 
Comba recommends that every horizontal cable entry to the equipment forms a 'U' before its entry to the 
equipment. Water on the cable will drip down at the bottom of the loop and will not accumulate at the 
equipment connectors.