Comba Telecom Ltd. RH-7W22B-D Manual De Usuario

Descargar
Página de 57
INSTALLATION GUIDE FOR RH-7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 21 
 
 
 
 
3.3  INSTALLATION PROCEDURES 
3.3.1  GOODS INWARDS INSPECTION 
 
Verify the number of packages received against the packing list.  
 
Check all packages for external damage; report any external damage to the shipping courier. If there is 
damage, a shipping agent should be present before unpacking and inspecting the contents because 
damage during transit is the responsibility of the agent.  
 
Open and check each package against the packing list. If any items are missing, contact Comba.  
 
Do not remove items from anti-static packing until ready for installation. If damage is discovered at the 
time of installation, contact the shipping agent. 
 
 
3.3.2  TOOLS 
See Appendix A for a full list of the recommended tools required for installation and routine maintenance. 
 
 
3.3.3  PREPARATION 
  Wall mounting with the masonry bolts supplied, which make use of the outer holes. 
 
 
 
 Figure 9: Mounting Rack Overview