Comba Telecom Ltd. RH-7W22B-D Manual De Usuario

Descargar
Página de 57
INSTALLATION GUIDE FOR RH-7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 28 
 
 
 
 
Table 4: Commissioning Task Explanation 
Commissioning Tasks 
Observation 
1.  Isolation detection 
 
Detect isolation of service antenna and donor antenna. 
2.  Set control channel 
frequencies 
 
Enter the center frequency of the main control channel, the 
commissioning guide will provide recommended DL/UL gain settings 
based on main control channel input power and the total channel 
numbers. 
 
Users can skip this step and directly finish the commissioning guide 
even if the frequency information or the total channel numbers are 
unknown. Users are able to set the DL/UL gain manually any time 
after the isolation detection has been completed and passed. 
3.  Set Channel No. 
 
Enter the total channel numbers 
4.  Recommended DL and UL 
gain parameters 
 
The commissioning guide will provide recommended DL/UL gain 
settings.  
 
Users will still need to set all the gains manually in the “Device” pages, 
and the frequencies for all the independent channels in the same 
“Device” pages after the commissioning process is finished. 
 
 
End of Section