Comba Telecom Ltd. RX-7W22-A Manual De Usuario

Descargar
Página de 55
INSTALLATION GUIDE FOR RX-7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 16 
 
 
 
 
3.2 
SITE PLANNING CONSIDERATIONS 
3.2.1  SITE PLANNING 
Site Considerations 
 
Outdoor equipment are designed to be waterproof, rainproof, and with snow protection. Temporary protection 
should  be  taken  when  the  equipment  enclosure  is  opened  for  installation  or  maintenance  in  an  outdoor 
environment. The equipment must not be  opened for installation  or maintenance in bad  weather (e.g. gale, 
storm rainfall, extreme temperatures and high humidity) 
 
 
Installation Location 
 
Mounting surface shall be capable of supporting the weight of the equipment. 
 
In  order  to  avoid  electromagnetic  interference,  a  proper  mounting  location  must  be  selected  to  minimize 
interference from electromagnetic sources such as large electrical equipment. 
 
 
Environmental 
 
Humidity has an adverse effect on the reliability of the equipment. It is recommended to install the equipment in 
locations having stable temperature and unrestricted air-flow.  
 
The installation location for the product should be well ventilated. The equipment has been designed to operate 
at the temperature range and humidity level as stated in the product specifications in the datasheet. 
 
Direct sun light exposure to the equipment should be avoided. Provide additional shelter if necessary. 
 
 
Power Supply 
 
The power supply unit (PSU) provides power to all modules within the equipment. Depending  on the product 
variant, it is recommended that the PSU be operated on a dedicated circuit breaker or fused circuit. 
 
 
Grounding Requirement 
 
Verify  that the  equipment  has  been  well  grounded.  This  includes  antennas  and  all  cables  connected  to  the 
system. Ensure lightning protection for the antennas is properly grounded.  
 
 
Cable Routing 
 
Depending  on  equipment configuration, a variety  of types of cables are required. Where applicable, ensure 
cables are properly routed and secured so that they are not damaged. 
 
 
Manual Handling 
 
During transportation and installation, take necessary handling precautions to avoid potential physical injury to 
the installation personnel and the equipment.