Comba Telecom Ltd. RX-7W22B Manual De Usuario

Descargar
Página de 51
INSTALLATION GUIDE FOR RX-7W22-B 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 16 
 
 
 
 
3.2.2  INSTALLATION CHECKLIST 
  Working  space  available  for  installation  and  maintenance  for  each  mounting  arrangement.  Ensure 
unrestricted airflow. 
  Ensure earth ground point is within reach of the ground wire. 
  Ensure a power source is within reach of the power cord and the power source has sufficient capacity.  
  Where appropriate, ensure unused RF connectors are terminated. 
  Do  not  locate  the  equipment  near  large  transformers  or  motors  that  may  cause  electromagnetic 
interference. 
  Reduce signal loss in feeder cable by minimizing the length and number of RF connections. 
  Ensure VSWR of antennas system < 1.5:1. 
  Ensure equipment will be operated within the stated environment (see datasheet) 
  Observe handling of all cables to prevent damage. 
  Donor antenna should have a narrow beamwidth and positioned in line-of-sight (LOS) to the
 
donor BTS site 
so that the donor signal level is maximized. This allows the use of minimum gain to achieve the maximum 
DL  output  power.  The  UL  gain  is  typically  set  lower  than  or  equal  to  the  DL  gain  to  minimize  noise 
interference to the donor BTS 
  Service antennas should be selected based on the type of service area, e.g., indoor antenna for indoor 
application, and panel antenna for outdoor application.