Radwin Ltd. AMWL1530 Manual De Usuario
WinLink 1000 Installation and Operation Manual
Chapter
2 Installation and Setup
Installation and Setup
2-9
4. Alternating between each site, turn each ODU slowly while listening
to the buzzer beep sequence for the Best Signal sound, until
optimal alignment is achieved.
optimal alignment is achieved.
5. Secure the site A and site B ODUs to the mast/wall.
6. Monitor the link quality for about 15 minutes to verify stability.
6. Monitor the link quality for about 15 minutes to verify stability.
Buzzer Sequence
=buzzer on
=buzzer off
Description
Best Signal so far
Signal quality increased
No change in signal
Signal quality decreased
No air link
Figure
2-6. Beeper Sequence for ODU Alignment
Installing the Link
Installation and definition of all parameters are applied to both sides of
the link.
the link.
Î
To install the link:
1. Verify that the management station is properly connected to the
same LAN as the IDU, and the WinLink 1000 Manager application is
running.
running.
2. In the toolbar, click the Link Installation button.
The Installation wizard opens, (see
Figure 2-7
).