Honeywell International Inc. RTU-B12 Manual De Usuario

Descargar
Página de 30
Page 18 
Mounting the Unit on the Wall 
Vertical Assembly 
To assemble the unit in a vertical position, follow these steps: 
1. Drill two holes in the wall (to accommodate the 2 plastic dowels), so that 
the frame will cover the hole through which the cables pass. 
2.  Insert the cables in the cable clamp without pulling out the screws. 
3.  Use the dowels to fasten the frame to the wall. Make sure that the lamellar 
connector is in the UP position. 
4. Adjust the length of the cables so that they protrude by ~10cm from the 
wall, and fasten them to the cable crimp. 
5.  Fasten the cable crimp to the contacts in the direction shown in Figure 9. 
6. Place the remainder of the cable inside the frame and lock the cable 
clamp. 
 
NET
1
NET
2
GND
+1
2V
             
NET
1
NET
2
GND
+1
2V
NET
1
NET
2
GND
+1
2V
 
Figure 9: Wall position – vertical assembly