Innovative Control Systems Inc IGWT-660098 Manual De Usuario
800-356-2671 |
Accutech | www.accutech-ics.com
Contents
Chapter 1: The LC 1200 system
Overview
1-1
Features
1-1
How the system works
1-1
Single vs. Double Conditioning
1-2
Monitored zones
1-2
Perimeter Door application
1-3
Alarms
1-3
Internal vs. External alarms
1-4
Addressing Alarms
1-4
Escorting
1-5
Chapter 2: The LC unit
Specifications
2-1
Positioning
2-1
Mounting
2-3
Wiring
2-3
A Look Inside
2-4
Tamper Switch adjustment
2-7
Tuning
2-8
Chapter 3: Tags & TAD
Overview
3-1
Attaching Tags
3-1
Tag and Band Maintenance
3-2
LED Tag
3-3
The TAD
3-5
Chapter 4: The Magnetic Switch
Specifications
4-1
Positioning
4-1
Mounting
4-2
Wiring
4-3
Double Door Applications
4-3
Perimeter Door Applications
4-3
Chapter 5: Passive Infrared Reader (PIR)
Specifications
5-1
Positioning
5-2
Mounting
5-2
Wiring
5-3
Adjusting the PIR beam angle
5-3
PIR “Masking”
5-5
Chapter 6: The Keypad
Specifications
6-1
Positioning
6-2
Surface Mounting
6-2
Flush Mounting
6-3
Wiring
6-4
Programming
6-6
Chapter 7: Push Button Override (PBO)
Specifications
7-1
Positioning
7-1
Mounting
7-2
Wiring to the Keypad
7-2
Wiring to the LC unit
7-3
Chapter 8: External Sounders
System Sensor sounder
8-1
Multi-Tone Local Alert (MTLA)
8-2
Chapter 9: Magnetic Locks
Operation
9-1
What is Delayed Egress Circuitry?
9-2
3101 Series Magnetic Locks
9-2
3000 Series Magnetic Locks
9-8
Chapter 10: Elevator Deactivation
What to expect
10-1
Working with the Elevator Company
10-1
Specifications
10-1
Positioning
10-2
Mounting
10-2
Wiring
10-3
Summary for the Elevator Company
10-3
Chapter 11: Automatic Door Deactivation
Specifications
11-1
Positioning and Mounting
11-1
Wiring
11-1
Chapter 12: Fire Panel Interface (FPI)
Specifications
12-3
Positioning and Mounting
12-3
Verifying the Fire Alarm Dry Contacts
12-3
Wiring
12-4
Terminals
12-4
Chapter 13: Timer
Specifications
13-1
Positioning and Mounting
13-1
Wiring
13-2
Programming
13-3
Chapter 14: Alert Panels
Staff Alert Panel (SAP)
14-1
Graphic Display Panel (GDP)
14-4
Chapter 15: System Maintenance & Testing
Tag and Band Maintenance
15-1
LC units
15-1
Testing monitored zones
15-1
Chapter 16: FAQ & Troubleshooting
Tag
16-1
Tag Band
16-1
TAD
16-1
System (General)
16-2
System (Maintenance)
16-2
Troubleshooting
16-3
Appendix A: Component Cut Sheets
Glossary
G-1
Index
I-1