Trimble Inc. WCSNM941 Manual De Usuario

Descargar
Página de 37
Installation
SNM941 Connected Site Gateway Installation Guide | 
21
Trimble Earthworks gateway device installation
Determine the mounting location of the SNM941 device
The SNM941 can be installed in various locations; however the recommended location is near the cab 
roof-line, typically with the SNR radio. to allow for: 
ease of access
a minimal distance from the antenna
SIM card access
The SNM941 mounting is designed to be mounted concurrently with the SNR radio and to allow 
adequate space for attachment of the electrical harness, as well as the coaxial antenna connections. 
Plan the route of the electrical harness
Keep in mind the following factors:
The 34-pin connector on the electrical harness must reach and attach to the SNM941 device. It is not 
necessary to plug the connector into the SNM941 at this time. Be sure to disconnect the harness 
before beginning to make any other electrical harness connections
.
Connect the Internet Gateway connector to the Internet ETH 2 connector on the Earthworks 
harness.
Secure the SNM941 device
 Mount the SNM941 with the SNR Radio, using one of the following methods:
Stack the SNM941 mounting bracket between the SNR radio and the provided base bracket. 
DRAFT