Silverstone ST85ZF SST-ST85ZF Manual De Usuario
Los códigos de productos
SST-ST85ZF
Description:
Electrical Specification
SilverStone Technology Co., Ltd.
Subject:
SilverStone Technology
Model: ST85ZF
Switching Power Supply
Document No.:
ES-850-ZEUS-01
File Name: ST85ZF.doc Page : 11
6.5 Ground Continuity Testing
UL and TUV require that each power supply ground is tested, to ensure there is continuity between the ground
inlet of the power supply and the power supply chassis. This can be performed with an ohm meter, or an
electronic circuit that lights up and illustrates the ground has continuity.
Based on EN50116, ERG or TUV require that each power supply ground id tested with a 25Amp ground test.
UL and TUV require that each power supply ground is tested, to ensure there is continuity between the ground
inlet of the power supply and the power supply chassis. This can be performed with an ohm meter, or an
electronic circuit that lights up and illustrates the ground has continuity.
Based on EN50116, ERG or TUV require that each power supply ground id tested with a 25Amp ground test.
7. Reliability
7.1 Mean Time Between failures (MTBF)
The MTBF of the power supply shall be calculated utilizing the Part-Stress Analysis method of MIL217F or
Bellcore RPP. The calculated MTBF of the power supply shall be greater than 100,000 hours under the
following conditions:
Bellcore RPP. The calculated MTBF of the power supply shall be greater than 100,000 hours under the
following conditions:
Full rated load
120V AC input
Ground Benign
120V AC input
Ground Benign
25
°C
Technical information in this specification is subject to change without notice.
The revision of specification will be marked on the cover.
8. Connections
8.1 AC Input Connector and DC Wire Harness and Connector Requirements
Please refer to the attachment
9. Physical Characteristics Size
9.1 Power Supply Dimension: 150.0mm(W) x 86.0mm(H) x 180.0mm(D)