Hughes Network Systems 24HX-001 Manual De Usuario
1027145 – 0001 Revision E
Installation summary 1–3
Hub installation
Components to be installed
The following AIReach Broadband components are installed at the
hub site:
hub site:
•
ODU(s) – Integrated antenna and transceiver
•
IFL
•
Indoor unit(s) (IDU), including:
- IDU channel and control module (CCM)
- IDU service–specific interfaces (SSIs)
•
Optional: hub rack
Transmission equipment such as ATM and TDM multiplexers is
available from HNS as an option.
available from HNS as an option.
Summary of installation steps
Installation of HTs at a hub site consists of the following main
tasks:
tasks:
Install the mast mount – page 3–6
Determine the HT alignment direction – page 4–6
Install antenna mount – page 4–13
Attach the antenna to the mount – page 4–15
Adjust the antenna azimuth – page 4–18
Adjust the antenna elevation – page 4–20
Attach the transceiver to the antenna – page 4–23
Ground the ODU – page 4–25
Determine the IFL cable route – page 5–4
Install the IFL cable (inside the building) – page 5–7
Install IFL lightning arrestor – page 5–8
Ground the lightning arrestor – page 5–12
Install the IFL cable (on the roof) – page 5–13
Test the IFL cable – page 5–15
1.2
Installation
summary and
checklist
summary and
checklist