Crestron Electronics Inc TSW-760 Manual De Usuario

Descargar
Página de 7
 
NOTE:  There is a small amount of “play” in the bracket mounting, which allows room for the 
screwdriver. 
 
DO Complete the Installation 
Make connections to the touch screen using Crestron power supplies for Crestron equipment. Power 
and data connection to the touch screen is provided by a single Ethernet cable connected to the LAN 
port on the rear of the unit. A Crestron PoE (Power over Ethernet) power supply or PoE-capable network 
switch is recommended (both sold separately). Apply power after the Ethernet cable is connected. 
 
Once all connections to the device have been made, carefully hold the touch screen over the mounting 
bracket and gently place it in position. 
NOTE:  If the touch screen is not level after installation, pull the touch screen out of the mounting 
bracket and slightly loosen the screws holding the bracket into place. This procedure allows the 
mounting bracket to be slightly rotated. Once the touch screen has been repositioned, retighten the 
screws, reinstall the touch screen into the bracket, and ensure that the touch screen is now level. 
 
DO Access the Setup Screen 
NOTE:  The touch screen can take up to 120 seconds to boot. When power is applied for the first time, 
the following screen appears. 
 
Tap Enter Setup to display the main Setup screen.