Badger Meter Inc 2012WCE Manual De Usuario

Descargar
Página de 20
ORION® Water Endpoint
UNRELEASED DRAFT COPY ONLY
3.  Using the charts below, connect the ORION Universal 1 endpoint to an approved encoder according to the following  
guidelines. Verify the endpoint serial number prior to completing the wiring set up.
Due to the customized, factory wire configurations of the Hersey Translator, please contact Hersey to determine the 
terminal post wiring schematic for your encoders. Once the terminal post information is determined, use the Sensus 
ECR 11, OCE wiring directions below. 
NOTE: The terminal posts and wire colors may not match.
ORION CE Endpoints (Serial Number > 80,000,000) or ORION SE and ME Endpoints                
Universal 1 
Endpoint 
Wire
Sensus 
ECR II, 
ICE
Neptune 
ProRead
Elster  
AMCo 
ScanCoder
AMCO 
Invision
ARB-V*
Metron 
Hawkeye
Red
R
B
G
G
B
B
Black
B
G
B
B
G
B
Green
G
R
R
R
R
G
 
ORION CE Endpoints (Serial Number < 79,999,999)
Universal 1 
Endpoint 
Wire
Sensus 
ECR II, 
ICE
Neptune 
ProRead
Elster  
AMCo 
ScanCoder
ARB-V*
Metron 
Hawkeye
Red
R
B
G
R
B
Black
B
G
B
B
B
Green
G
R
R
G
G
 
R = 
Red
            B = Black           G = 
Green
 
*A separate ORION CE endpoint is available for connectivity to the Neptune ARB-V encoder.
4.  Connect the encoder cable wires to the ORION Universal endpoint wires using the insulation gel connectors  
provided in the installation kit. Refer to the chart to determine which wires need to be connected to complete an 
installation. The ORION system was designed as a three-wire AMR system only. 
 
Do not strip any insulation from the ends of the wires before you push them into the connector.
5.  Push the wires that are to be connected together as far as possible into the connector.
Figure 18: Wires In Connector
Page 18
                   5-11