F10 Installation Manual 
                         Rev. *60          
 
32 of 71
 
Adjusting Jumper Settings 
The default jumper settings for the F10, 2 meter system are OUT for J5 - J10.  
The settings are adjusted for the F10, 1 meter system.  Insert the red J5 and J6 jumpers.  
    Note: Later on, after the system is initially configured, each of the jumper positions are tested in order to 
optimize the tuning of the F10 antenna.  Refer t
 and complete the test.  
Wiring the 2 x 1 Meter System  
For the 2 x 1 meter configuration, the wiring to each antenna is consistent with the F10, 1 meter 
procedure. The main difference is there are two (2) coax cables routed to the electronics enclosure. 
Route each coax cable separately through two different pieces of ENT Tubing. The lengths of 
coax cable are connected to the two (2) male connectors on the A1116 Coax Adapter Board.   
  Note:  In instances where multiple electronics and coax cables are used, ensure that floor trenches or 
conduits are spaced 5cm [approx. 2in] apart.