L i b e r t y   U H X   I n s t a l l a t i o n   C h e c k l i s t :   I n s t a l l a t i o n   C h e c k l i s t  
4-4
Follow up Procedures
• Ensure that the installation checklist is filled out and initialed by Checkpoint, the 
Checkpoint contractor, and the onsite Target representative. The checklist should be 
faxed to the Onsite Project Coordinator.
• At the completion of the installation, a voice mail message must be left for the 
Installation Scheduler, Onsite Project CoordinatorAccount Representative, and 
the Project Manager
Table 4.1
Project contact information
Title
Name
Office
Ext.
Cell
Pager
Account Scheduler
Onsite Project 
Coordinator
[Customer Name] 
Project Manager
[Checkpoint 
Contractor Name] 
Point of Contact
Account Manager
Project Manager
Table 4.2
Door installation checklist
Item 
#
Door Designation (i.e., North Door)
No? Explain 
Below
Customer 
Initials
Checkpoint 
Initials
Checkpoint 
Contractor 
Initials
A
New layout agreed upon?
B
Replacement mat acquired? (if necessary)
C
Existing pedestals removed and disposed of?
D
Old drill holes repaired? (if necessary)
E
Floor mats removed?
F
Alvarado posts removed and disposed of?
G
Alvarado bumper post holes filled in? (if necessary)
H
New floor channel cut?
I
Walker duct and power supply boxes installed?
J
Power run from ceiling to floor?
K
Power run through walker duct to pedestal riser?
L
Power wires crimped and connectors installed?
M
CAT 5 cable run and terminated at pedestal riser?
N
CAT 5 cable crimped and connectors installed?
O
Floor cut filled in?
P
Floor covering repaired/installed/replaced?
Q
Work area is clean and ready for store opening?
R
Pedestals tested and properly functioning for EAS?
S
Pedestals tested and properly functioning for UHF?