Checkpoint Systems Inc. LIBUHX Manual De Usuario

Descargar
Página de 38
5-5
L i b e r t y   U H X   U p g r a d e   G u i d e
Verification of Power Settings
To verify the power settings, complete the following:
1
Click the Read Point Class link on the left hand navigation bar.
2
Select Area (from class list on the right hand side).
3
Click Select Class.
4
Verify Gain is set to 50%.
5
Verify Retry is set to 1.
6
Verify Air Protocol is set to ALL.
Figure 5.6 
Read Point Classes screen
A Gain setting of 50% corresponds to a setting of 256 7 in the ART (Advanced Reader 
Test console) program contained in the reader.