Checkpoint Systems Inc. NEO-C Manual De Usuario

Descargar
Página de 14
 
 
USER'S MANUAL, NP10 AND NP20 
 
 
CHECKPOINT SYSTEMS, INC. CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY 
Document No. 10071753 
Rev. 00 
Page 14 of 14 
the DC Power input (i.e. do not connect 2 power supplies directly to 1 reader). J6 and J14 
are wired in parallel, allowing the installer to daisy chain a second RF Only system; use 
only the approved power supply for your region; in FCC use 10043582. The third bottom 
row connector port (J3) is for future expansion.  
The DC power wire must be 3 conductor (2C w/ drain wire), 18 AWG or greater, 
maximum 10m [32.8ft]. The PSU drain wire is grounded to chassis GND with crimp 
terminal. A small bracket with ground lugs will be described in the installation manual.  
The connector pinout for DC power INPUT connector is below: 
Table 2: Power Connector Pin Assignments 
PIN # ON TR4300 (J6/J14)  
COLOR 
SIGNAL 
EXAMPLE 
Bare wire (shield/ 
drain wire) 
Chassis Ground 
(GND) 
 
Red 
+24V 
Black 
GND 
 
Note: Other internal factory wiring will be detailed in reference sections in the Field Service manual. 
 
6.0 DEVICE LABELING 
Each NEO will have a label, found in the base region, which indicates this specific unit’s 
Model Name, part number, revision and the serial number of the unit manufactured, as 
well as regulatory information. For example: 
 
FCC ID: DO4NEO 
 
This device complies with Part 15 of the FCC Rules.  
Operation is subject to the following two conditions: 
(1) this device may not cause harmful interference, and  
(2) this device must accept any interference received, including interference that may 
cause undesirable operation.