Checkpoint Systems Inc. OMNI Manual De Usuario

Descargar
Página de 12
                          363325  Rev. 01
Page 5 of 9
Installation of Docking Station
Select a location, which is convenient for the operational requirements on a vertical, dry wall and within easy access to an
outlet.
Mount the docking station at a height, which is comfortable for all intended users.
Secure the docking station to the wall with the mounting hardware (screws and wall anchors) provided, in the orientation
shown in Figure 2.
Connect universal power supply into AC Outlet/Mains and connect the round DC jack into the bottom of the docking station.
See Figure 1Do not allow the universal power supply to hang from the Docking Station, the DC Plug and Docking
Station will separate.  
OMNI VERIFIER MUST BE CHARGED IN DOCKING STATION 
FOR 24 HOURS BEFORE INITIAL USE.
 
FIGURE 2