Checkpoint Systems Inc. TPRO7100 Manual De Usuario

Descargar
Página de 10
  
                        INSTALLATION PROCEDURE,
TPRO7100 AND TPRO7200
____________________________________________________________________________________________________________________________
CHECKPOINT SYSTEMS, INC. CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY.
Dwg. No. 813910 
    Rev. *60
Page 6
  Digital voltmeter "universal type DVM”
  A BNC to SMB interface cable
  Frequency counter capable of resolving 1 Hz at 13.56 MHz
4.3  
TPRO7100 AND TPRO7200 CONNECTIONS
The TPROs are delivered with:
  External 12V wall pack power supply
  Optional Bar code scanner (TPRO7200 only)
The TPRO7200 has a connector panel on the side.
Install the peripherals as follows:
1.  Power Connections
  Connect the 12V wall pack power supply to the power jack.
2.  Bar Code Scanner Connections (TPRO7200 only)
  Connect the bar code scanner to the connector labeled “COM 4”.
  Plug the bar code scanner power supply into an AC outlet (120V, 60Hz).
3.  Network Connections (TPRO7200 only)
  Connect the network cable to the RJ-45 connector on the connector panel.
5.0 
TPRO7200 SINGLE BOARD COMPUTER
The SBC is the interface controller for the following tasks:
  Communication of read only RFID tag data via 10Base-T ethernet or bar code data via
RS-232 to the application server.
The SBC interface connections are described in the table below.
SBC Interface Table
Cable
SBC
TR4090
Connector Panel
Function
Connector Panel
Label
Connector Type
COM1
J1
J6
COM2
J2
DIAGNOSTIC
COM 2
9 pin M
MiniD-Sub
COM3
J3
PASS THRU
COM 3
9 pin M
MiniD-Sub
COM4
J4
BARCODE
COM 4
9 pin M
MiniD-Sub
Ethernet
J13
ETHERNET
ETHERNET
RJ-45
Power
J6
J2
Antenna
J1
6.0
BASEBAND SIGNALS
It is possible to observe baseband signals and noise at two locations.  The noise floor you will
observe is comparable to what can be seen in EAS systems.