Honeywell International Inc. KXP2290 Manual De Usuario
n
KXP 2290
Rev. 0c, June/2006 Preliminary 05/24/06 10689I00.JA
Page 2-38
(2)
System Interwiring Check
To check the aircraft and transponder system interconnections proceed as follows:
(a)
Check that all cables and interwiring are installed in accordance with the In-
terwiring and Cable Harness Fabrication instructions (paragraph
terwiring and Cable Harness Fabrication instructions (paragraph
).
(b)
Using the interconnect diagram (see
), check wiring for proper destination, opens, and
shorts.
(c)
Check rf cables for insertion loss and VSWR.
(3) Visual
Inspection
In conjunction with system installation, perform the inspection/check procedure (
).
(4) Post-Installation
Test
Perform the ATC transponder tests and inspections noted in section
(per Federal Aviation Regulation Part 43).