Ever Sinline Pro 10 000 - 10kVA, VRLA 2x28x7Ah W/SLPRTO-0010K0/01 Manual De Usuario

Los códigos de productos
W/SLPRTO-0010K0/01
Descargar
Página de 8
EVER Sp. z o.o.  ul. Grudziñskiego 30, 62-020 Swarzêdz
tel. 0048 61 6500 400, fax 0048 61 6510 927, e-mail: ups@ever.com.pl
CONNECTION TERMINALS
NOTE! The UPS should be connected by qualified and authorised personnel only. The UPS 
Is completely disconnected from the power network only when the power supply cord is 
disconnected.
!
It is recommended for the protection systems in the building's electric system to be used as one of the measures of 
protection. The parameters of the building's electric wiring system protection should be selected in accordance with 
the type and magnitude of the load connected to the wiring system. In extreme cases, the different protection 
parameters of the building and power supply unit's systems may cause the former to be activated more rapidly.
 
 
F3 
F4 
WEJ AC  
input terminals
L  
B

WYJ AC 
output terminals
 output phase line
 output neutral line
WEJ DC 
input terminals for the external battery pack
+
 
 
F5
 -   
protection for the external battery pack terminal (fuse- link)
protective earthing point, connection of a cable with an eyehole connector using an M6 screw
The UPS is not provided with connection wires with sockets. Therefore, the connection takes place by 
screwing down the ends of the individual conductors to the connector. Then, the conductors need to be 
protected against being pulled out with clips that are attached to holders below the connection terminals.
The wire sizes specified in the wiring guidelines should be used. The conductor ends should be finished 
with metal sleeves.
Service BYPASS line protection
Primary line protection
service BYPASS phase line
primary phase line
primary neutral line
red pole
blue pole
 
 
 
SINLINE PRO 10 000