Unique Broadband Systems Ltd. DRU1KW Manual De Usuario

Descargar
Página de 176
 
 Chapter 
Maintenance 
 
6.5.7.2 
High Band Cabinet HPA PS (30 VDC Rectifier Module) Installation 
 
The replacement HPA PS should be installed in the following sequence: 
 
1.  Slide the black release button on the rectifier module front grill/cover cover to the 
right to release the grill/cover from the front of the rectifier module – see Figure 6-13
2.  Position the rectifier module so that the open grill cover is facing down. 
3.  Slide the rectifier module into the empty slot on the HPA PSU mounting shelf until it 
stops – see Figure 6-12. 
4.  To secure the rectifier module in place, lift the grill cover up and push it towards the 
rectifier module until it clicks in place.  As the grill cover is pushed in place, the 
rectifier module will slide all the way into the slot – see Figure 6-12. 
5.  Switch ON HPA PSU circuit breaker, located on the HB cabinet PDU or LB cabinet PDU, 
which corresponds to the affected rectifier module – please refer to section 2.3.4 or 
2.3.5 for breaker designations. 
6.  Using the HBE GUI or LBE GUI, place the corresponding sub-system in broadcast 
mode. 
7.  Close the HPA compartment front door and the electronics compartment front door. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SX03-20000-01-M01 6-28