Avaya Integral 5 Easy BND AR2.X 4999108494 Manual De Usuario
![Avaya](https://files.manualsbrain.com/attachments/539de53b12b0cfce0bb8cf1e3bb961e969d9f556/common/fit/150/50/0bfb423b07b431ecf5ac095ccde7771f5eac50e962dfba59f8e256280b3d/brand_logo.png)
Los códigos de productos
4999108494
Installation manual Integral 5 D/E easy
Commissioning
06/07
225
4.999.112.593
Commissioning
Check List
Before you switch on the system and begin to operate it, it is essential to carry out the earthing procedures
(the green-yellow earth wires must be stripped and connected).
Check List
Before commissioning the system, run through the check list to ensure that all
preparations have been completed correctly:
System modules connected correctly?
Connection cables to the UAE sockets and exchange lines (a/b) connected correctly
on the LSA+ strips of the distributor according to diagram?
Patch cables connected correctly?
System earthed properly?
UAE sockets connected correctly and telephones connected?
For S
0
bus operation:
Termination resistances fitted and connected at each final bus-UAE connection socket?
Bus cable lengths correct?