BlueWalker 10120174 Manual De Usuario

Descargar
Página de 60
21
5 Electrical installation
5.1 Electrical Preparations 
The UPS unit has the following power connections:
Three-phase (L1, L2, L3), Neutral (N) and Protective Earth (PE) connection for the rectifier
input.
Three-phase (L1, L2, L3), Neutral (N) and Protective Earth (PE) connection for the bypass
input ( N is INTERNALLY common for rectifier and bypass inputs).
Three-phase (L1, L2, L3), Neutral (N) and Protective Earth (PE) connection for the load
output.
Positive pole (+),Negative pole (-), Common midpoint/Neutral pole and Protective Earthing 
(PE) connection for the external batteries.
24 red wires with an approximate length of 8 cm and 2 red wires with an approximate length 
of 30 cm for BAT+.
7 red wires for BAT+ connection between Shelf 1 and Shelf 2; 4 blue wires for BAT N inside 
Shelf 3.
Note!
It must be ensured that no line input source can accidentally be connected to the UPS 
during installation.
Warning!
Installation may only be carried out by qualified technicians and in conformity with the 
applicable safety standards.
5.2 Installation and wire connection diagram 
Warning!
The UPS unit is not applicable to the IT power distribution system.